GE SR750 PDF

GE MULTILIN SR FEEDER MANAGEMENT RELAY NEW VAC. General Electric P5-G5-S5-HI-AR-E. General Electric GE MULTILIN SR GE MULTILIN SR FEEDER MANAGEMENT RELAY NEW VAC, WITH CASE. General Electric P5-G5-S5-HI-AR-T-H. General Electric GE. Find great deals for GE Multilin Feeder Management Relay Sr Shop with confidence on eBay!.

Author: Gura JoJozil
Country: Seychelles
Language: English (Spanish)
Genre: Travel
Published (Last): 22 May 2017
Pages: 466
PDF File Size: 11.95 Mb
ePub File Size: 18.75 Mb
ISBN: 354-8-74621-356-4
Downloads: 26456
Price: Free* [*Free Regsitration Required]
Uploader: Grotilar

When the measured quantity exceeds the pickup level, the relay can trigger an alarm or signal an output.

Convenient COMTRADE and Sequence of Events viewers are an integral part of the Setup software included with every relay, to carry out postmortem event analysis to ensure proper protection system operation.

VT Failure The VT failure feature monitors each phase of input voltage, generating an alarm and sending the programmed output signals when a failure is detected. This memory can be configured between the ranges of two to 16 blocks with 16 to power frequency cycles of data respectively. The baud rate of all the serial ports is variable from to 19, bps. A failure to respond to an open or close gd in a programmed time can be gr to generate an alarm.

Event Recording The relay captures and stores the last events, recording the time, date, cause, and system parameters. Fault Locator The relay uses captured data to calculate the type, distance to and the impedance of the fault.

Grid Solutions helps enable utilities and industry to effectively manage electricity from the point of generation to the point of consumption, helping to maximize the reliability, efficiency and resiliency of the grid. Any external quantity may be monitored via an auxiliary current input.

The can display 30 user-selected messages during keypad inactivity.

The relay uses captured data to calculate the type, distance to and the impedance of the fault. With the new 8 Series Retrofit Kit users are able to install the Feeder Management System without modifying existing cutouts and wiring, and without any drawing changes or re-engineering time. Events may be recorded selectively by category, so that only events of interest are recorded. The relay calculates the per-phase wear on the breaker contacts to establish a threshold.

  ISO IEC 15288 FILETYPE PDF

A 40 character display allows access to setpoints, actual values, and diagnostic messages generated by a trip or alarm condition. About Grid Solutions GE’s Grid Solutions business serves customers globally with over 17, employees in approximately 80 countries.

This easy to use relay provides comprehensive protection functions for feeders and back up protection for bus, transformers and transmission lines at a reduced product life cycle cost.

The VT failure feature monitors each phase of input voltage, generating an alarm and sending the programmed output signals when a failure is detected. User Interface Various user interfaces facilitate operation of the Analog Inputs Any external quantity may be monitored via an auxiliary current input. Records of the last 10 faults are stored. The number of breaker trip operations is recorded, and can be displayed for statistical purposes useful for units without operation counters.

Display A 40 character display allows access to setpoints, actual values, and diagnostic messages generated by a trip or alarm condition. This product is under last-time buy. As an alternative, please refer to the relay. The front panel port allows easy local computer access.

When the breaker maintenance threshold is exceeded the relay can trigger an alarm. EnerVista 8 Series Setup Software provides automated setting file conversion. Insert the new 8 Series Ye chassis into the switchgear and simply plug-in the old terminal blocks – there is no need to make any cut-out modifications or push and pull cables. A rear Ethernet port is also available as an optional feature.

A block of configurable volatile memory can be used for recording samples of the AC input voltages and current, and the status of logic inputs and output relays. Two analog input level monitoring elements and two rate-of-change elements are available.

  EL PROGRESO DEL PEREGRINO DE JOHN BUNYAN PDF

General Electric GE MULTILIN SR CASE NEW

Traditionally, retrofitting an existing relay has been a challenging, time consuming task often requiring re-engineering, new drawings, panel modifications, re-wiring and re-testing.

No need to disconnect any of the field wiring. Load shedding schemes based on voltage and frequency elements Back-up protection for transmission lines, feeders and transformers Distributed Generation DG interconnect protection.

Oscillography A block of configurable volatile memory can be used for s750 samples of the AC input voltages and current, and the status of logic inputs and output relays. The relay captures and stores the last events, recording the time, date, cause, and system parameters. Trip Counter The number of breaker trip operations is recorded, and can be displayed for statistical purposes useful for units without operation counters.

GE Multilin 750 Feeder Management Relay Sr750

Indicators Twenty LEDs indicate relay status, system status, and trip and alarm conditions. The amount of pre-event data recorded is set by the user. Orders may be placed until 31st Decemberand will be fulfilled based upon availability.

An alarm is also generated if the relay detects that the supervisory trickle current is not ye. Simply remove the terminal blocks and then remove the SR chassis from the panel.

Breaker Conditions The relay calculates the per-phase wear on the breaker contacts to establish a threshold. Once completed, a graphical report is provided to verify and call out any specific settings that may need attention. Trace memory recording can be triggered by operation of selected features or logic inputs.